Interstate 99, or I-99 is an interstate highway that runs 1335 miles along Morseville's length. The southern terminus is in Forester, Morseville, at the southern point of the state. The terminus is the border of Canada in Snow Valley, Morseville, the most Northern City in the state. It was formerly I-1 before it was changed in 2016.
History
From 1956, Interstate 1 was planned and then built with a gap between Sander City and Applewood in Liguria County due to preserving of swamplands. It was completed by the late 1960s. In 2016, MVDOT renumbered the Interstate to Interstate 99. In early autumn 2017, Liguria County declines Interstate 99 and was routed into Tazewell County. However in November 2017, Martin Luther King Jr Expressway was getting constructed in northern Sander City and Liguria County after Liguria County approves I-99, filling in the gap. Martin Luther King Jr. Expressway was also once signed as SR 699 before getting signed as I-99 in Trois Island County's section.
Route Description
Interstate 99 is maintained by MVDOT (Morseville Department of Transportation).
Forester
Interstate 99 begins at US 98 at the southern coast of Forester traveling northeast until reaching I-399/US 98. I-99 then heads north around less than a mile from the coast to Sander City's southern suburbs.
Sander City & Metro Area
Interstate 99 goes to the Sander Metro from the newly expanding southwest part of the area. Makes a interchange with SR 2/SR 3 (Jefferson-Davis Highway), the exit to Sander-Plainfield International Airport. SR 2/SR 1 splits from I-99 then goes over Storm Lake and goes through downtown. Meanwhile, Interstate 199, loops to the west of Sander City. North of Sander City, Interstate 99 goes straight to Applewood meanwhile SR 1 stays along the coast. Interstate 99 goes in a courrency with Interstate 10 then Interstate 2 into Tazewell County. Then, I-99 heads straight towards Applewood.
Sander City Route Gap
Before I-99 was transferred onto Interstate 10 into Tazewell County, it virtually had a gap between Sander City and Neapolis County. At one point, Liguria County declined the interstate. So Tazewell County have accepted the interstate instead.
Martin Luther King Jr. Expressway
But around Mid-November 2017, Liguria County accepts Interstate 99 passing through their county and construction began. This portion is called the Martin Luther King Jr. Expressway which is now finished in Trois Island County.
Applewood
Interstate 99 was known as the Forester-Applewood Highway. I-99 goes into Jericho Township straight to Applewood.
Forto-Viewport
In Forto, Interstate 99 have no auxiliary interstates, but Morseville Route 1 goes in a concurrency. Morseville 1 goes off as the MacAurthur Skyway. In Viewport, Interstate 99 is not too hilly or doesn't curve too much compared to Morseville Route 55 and US 801.
Viewport-Canada
Interstate 1 goes flat all the way from Viewport to Snow Valley, which includes Jacksontown and Tuson. In Snow Valley, Interstate 99 ends at the 1335th mile at the Canadian Border.
Exit list
County | Location | mi | km | Exit | Designations | Notes |
---|---|---|---|---|---|---|
Pike | Forester | 0 | 0 | 1 | U.S. Route 98 | Incomplete interchange; Northbound exit, southbound entrance |
2.1-2.25 | 3.38-3.62 | 2A/B | Interstate 399/US 98 | Interstate 399 Western Terminus | ||
Weayaynah | ||||||
Mosquito | ||||||
Currituck | ||||||
Thorn River | 105.9-106.2 | 170.429-170.912 | DuPont Bridge | |||
Trois Island | Snyder Township | 107.1-107.4 | 172.361-172.844 | 107 | Future Interstate 97;
SR 406 |
Under Construction |
Winchester Township | 108.1-108.3 | 173.970-174.292 | 108A-B | Oceanside Parkway | Exit 108A; UNDER CONSTRUCTION | |
Novorossiya | 108.6 | 174.774 | SR 1 (St. Petersburg Blvd) | Exit 108B: Southern end of MV 1 concurrency. UNDER CONSTRUCTION | ||
Sander City | 109.3-109.5 | 175.901-176.304 | 109A-C | SR 2/SR 3
(Jefferson Davis Highway) |
Exit 109A: Southern end of MV 2 concurrency; Northern end of MV 3 concurrency. | |
Interstate 199
SR 1/SR 2 |
Exit 109B: SR 1/SR 2 (Oceanview Drive)
Exit 109C: I-199 (Sander City Western Loop) Northern end of MV 1 & MV 2 concurrencies. | |||||
109.8-110.10 | 176.706-177.19 | 110A-C | Storm Lake Road | Exit 110A | ||
Interstate 10, SR 4 | SOUTBOUND:-Exit 110C: I-10 & SR 4 WB
-Exit 110B: I-10 EB NORTHBOUND: -Exit 110B: I-10 | |||||
110.9 | 178.476 | 111 | Sander Beach Access Road | Incomplete Interchange | ||
111.4 | 179.281 | 112A | Interstate 199 | Northbound exit, southbound entrance | ||
111.5 | 179.442 | 112B | Township Line Road & US 90 (Star Tannery Road) | Exit 112 on I-99 Southbound | ||
Valley Township | 111.9 | 180.085 | 112C | SR 699 | ||
Liguria | Angrinopolis | 112.2 | 180.568 | 112D | SR 1 | Southern end of MV 1 concurrency |
Aemilianopolis | 112.5 | 181.051 | 113 | SR 3 & SR 1 (Plainfield Road) | Southern end of MV 3 concurrency.
Northern end of MV 1 concurrency. | |
Finning | ||||||
Neapolitania | ||||||
Nikepohoros | ||||||
Orchard | Jericho Township | 347.9 | 559.891 | 347 | MV 11 (Zehrender Road) | |
Applewood | 349.08 | 561.79 | 348 | US 64, US 74, MV 38, MV 11, US 70 BYP. (Warwick Blvd) | ||
349.56 | 562.56 | 349 | US Hwy. 70 TO SR 27
(20th Avenue) - Applewood Metropolitan Airport |
|||
350.05 | 563.35 | 350 | Interstate 40/10th Avenue | Signed as 350A (east) and 350B (west); Exit 100 on Interstate 40; Exit 350C (Northbound Only) 10th Ave. | ||
351.02 | 564.91 | 351 | MV 27
(Front St) |
|||
Allegheny | ||||||
Canadian | American River City | 1334.01 | 2146.88 | 1334 | MV 98
- American River City, Snow Valley |
|
Snowdale Township | 1334.58 | 2147.798 | 1335 | Interstate 92 (Northern Turnpike) |